Mount Connection
Tuesday 1 October 2019
The main thrust of the day was to clear the remaining section of thick vegetation overgrowing the track on the western side of Mount Connection. But there was also a few spots at the eastern end where the wire on the boardwalk had lifted and needed repair.
One vehicle was taken to that end and we took the opportunity of clearing the first 100 metres of the Tom Thumb track. From the eastern end of Mount Connection a party of two walked through to repair the wire with staples and remove any overgrowth needing attention, including sawing through a tree that had fallen over the track. The remaining party cleared the vegetation needing work on the other side.
The main thrust of the day was to clear the remaining section of thick vegetation overgrowing the track on the western side of Mount Connection. But there was also a few spots at the eastern end where the wire on the boardwalk had lifted and needed repair.
One vehicle was taken to that end and we took the opportunity of clearing the first 100 metres of the Tom Thumb track. From the eastern end of Mount Connection a party of two walked through to repair the wire with staples and remove any overgrowth needing attention, including sawing through a tree that had fallen over the track. The remaining party cleared the vegetation needing work on the other side.
Lunch location on a calm sunny day high on Mount Connection. |
Comments
Post a Comment