Reduced Scrub
Tom Thumb Track
Wednesday 27 December
2017
The track to Tom Thumb
has been subject to a few comments about it being scrubby and there has been
confusion as to where it starts for some people.
On this opportune day we
set off with Peter from PWS down the rough Big Bend Fire Trail in a tough 4WD
to add a sign to mark the start and to remove some of the scrub which is doing
its best to obliterate parts of the track.
The post was set in concrete at the side of the fire trail and the vegetation
pressing on was cut back modestly.
Greg and Peter preparing to concrete the pole |
Greg B and Greg K clearing the overgrrown track |
The track is now
obvious although it is still rough underfoot with some scrambling over boulders
still needed to get to the top. Some bauera heavily impacting the early part of
the way remains and will be cut back at a later date.
On the drive out we
stopped at the junction of the East West and Mount Hull fire trails to check on
an old Erica location. Unfortunately, we
discovered quite several plants there. These had grown since our last visit in
June 2013. Hopefully all were removed including those found growing within the cheeseberry
bushes which are now vigorously colonising the site.