The Wet Area Completed
South Wellington Jan 2019
14 January 2019
The last 4-5 metres of track was hardened completing a 20 metre section tat had been degraded. The area becomes wet with puddles of water for lengthy periods of the year and this has resulted in much braiding and damage to vegetation.
The rocks used were generally quite large and the three track members from City of Hobart along with Greg were needed to carry each rock, with the aid of a stretcher.
A large rock on the way to the track Lindsay, Jerram and Greg - Travers hidden |
Lindsay and Greg inspecting finished work, Travers in background |
Large rocks inserted last month view north
These rocks were placed last month see the photo below
|
This is the same location in December |
Quite a number of walkers went past, and it was good to see that most were reasonably young